Betco AX-IT® PLUS Stripper 1 galon

Sort By:

APPLICATION & MAINTENANCE

CONCRETE, STONE, OR BRICK: New floors should be allowed to cure for at least thirty days prior to applying this product. Application of this sealer to floors or surfaces colder than 600 F is not recommended. Wash the floor thoroughly with #150 Grease Cutter or #155 Grease Strip to remove any dirt, oil, or grease. Heavy concentrations of oil, grease or other petroleum soils should be spot cleaned with #820 Citru-Gest. The floor should be rinsed thoroughly with clean water before applying the sealer. When dry, vacuum floor to remove any dust or loose dirt particles. NOTE: If the composition or origin of an existing finish is unknown, it is strongly recommended that a test patch be applied to determine compatibility and adequate adhesion characteristics. Apply a thin, even coat of Rock On using a lambswool applicator or squeegee/drag bar applicator, avoiding puddling or uneven application. Allow the first coat to dry for 40 to 60 minutes. Apply additional coats until desired build and appearance are obtained. A minimum of two or three coats is recommended. Maintain the floor by damp mopping with Tops Neutral Cleaner or one of Perma’s high quality all purpose cleaners, depending on soil conditions.